Monitoring of steel railway bridge and continuous welded rail
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F14%3A00213442" target="_blank" >RIV/68407700:21110/14:00213442 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Monitoring of steel railway bridge and continuous welded rail
Popis výsledku v původním jazyce
The continuous welded rail (CWR) is standardly used on almost all modern railway bridges. However, its placement results in the interaction between CWR and the structure. That brings not only the longitudinal forces on the substructure, but also a significant additional stresses in the rail. These stresses can result either to the rail brak, or track buckling. Unfortunately, the input parameters for performing numerical analysis are hardly accessible and they vary significantly in different sources. Because of that, the extensive long-time monitoring of the rail-bridge interaction was performed on the bridge with the unusual combination of ballast track, direct fastening and barrier in the ballast. The paper presents the results of the monitoring and comes with the analysis and evaluation of formulas, defining the fastening nonlinear stiffness of track to bridge connection. The influence of the temperature to the ballast stiffness is analysed as well.
Název v anglickém jazyce
Monitoring of steel railway bridge and continuous welded rail
Popis výsledku anglicky
The continuous welded rail (CWR) is standardly used on almost all modern railway bridges. However, its placement results in the interaction between CWR and the structure. That brings not only the longitudinal forces on the substructure, but also a significant additional stresses in the rail. These stresses can result either to the rail brak, or track buckling. Unfortunately, the input parameters for performing numerical analysis are hardly accessible and they vary significantly in different sources. Because of that, the extensive long-time monitoring of the rail-bridge interaction was performed on the bridge with the unusual combination of ballast track, direct fastening and barrier in the ballast. The paper presents the results of the monitoring and comes with the analysis and evaluation of formulas, defining the fastening nonlinear stiffness of track to bridge connection. The influence of the temperature to the ballast stiffness is analysed as well.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/TE01020168" target="_blank" >TE01020168: Centrum pro efektivní a udržitelnou dopravní infrastrukturu (CESTI)</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2014
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of the METNET Seminar 2013 in Lule?
ISBN
978-951-784-641-7
ISSN
1795-4231
e-ISSN
—
Počet stran výsledku
3
Strana od-do
34-36
Název nakladatele
HAMK University of Applied Sciences
Místo vydání
Hämeenlinna
Místo konání akce
HAMK University of Applied Sciences
Datum konání akce
22. 10. 2013
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—